Quick answers
What is this project?
Kimkridisa/P.Dihajeng River Boulder and Sand Gravel Mining Permit Area is an approved mining project in Maibong, Mahur, Dima Hasao, Assam. The site covers 5.6 acres.
Who is building it?
The applicant is Biprojit Langthasa.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Apr 2025), as of 27 Nov 2026.
Where is it?
In Maibong, Mahur, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹50 lakh and a site of 5.6 acres.
When was it filed?
The application was filed on 18 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Apr 2025 |
| Application filed | 18 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Biprojit Langthasa |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Maibong |
| Taluk / tehsil | Mahur |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00716 |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.6 acres, this one is smaller than 91% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Maibong, Mahur, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Motibra II, River Boulder and Sand Gravel Mining Permit Area — lapsed, 2.5 km away
- Motibra I, River Boulder and Sand Gravel Mining Permit Area 2 — environmental approval granted, 2.6 km away
- Solikantapur, River Boulder and Sand Gravel Mining Permit Area-2 — lapsed, 3.1 km away
- Mahur River (Amlangbra Village) Sand, Gravel & Boulder Mining Permit Area — environmental approval granted, 9 km away
- Mahur River (Thaisiling Hawer Village) Sand, Gravel & Boulder Mining Permit Area — lapsed, 11 km away
- Assam/PSP04 — cleared for impact study, 11.6 km away
- Sand Gravel and Boulder Mining Permit Area at Mahurbra Area of Mahur River — lapsed, 13.9 km away
- Sand Gravel and Boulder Mining Permit Area at Dikrengma Area of Diyung River — not approved, 14.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.