Quick answers
What is Motibra II, River Boulder and Sand Gravel Mining Permit Area?
Motibra II, River Boulder and Sand Gravel Mining Permit Area is a lapsed mining project in Maibong, Mahur, Dima Hasao, Assam. The site covers 7.6 acres.
Who is building it?
The applicant is Norket Warisa.
Has it been approved?
No. The application was lapsed on 10 Mar 2025, so it is no longer under consideration.
Where is it?
In Maibong, Mahur, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹50 lakh and a site of 7.6 acres.
When was it filed?
The application was filed on 11 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Mar 2025 |
| Application filed | 11 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Norket Warisa |
| Land area | 7.6 acres (3.1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Maibong |
| Taluk / tehsil | Mahur |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00733 |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.6 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Maibong, Mahur, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Motibra I, River Boulder and Sand Gravel Mining Permit Area 2 — environmental approval granted, 550 m away
- Kimkridisa/P.Dihajeng River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 2.5 km away
- Solikantapur, River Boulder and Sand Gravel Mining Permit Area-2 — lapsed, 4.9 km away
- Mahur River (Amlangbra Village) Sand, Gravel & Boulder Mining Permit Area — environmental approval granted, 7.4 km away
- Mahur River (Thaisiling Hawer Village) Sand, Gravel & Boulder Mining Permit Area — lapsed, 9.7 km away
- Assam/PSP04 — cleared for impact study, 11.2 km away
- Sand Gravel and Boulder Mining Permit Area at Dikrengma Area of Diyung River — not approved, 12.3 km away
- Sand Gravel and Boulder Mining Permit Area at Mahurbra Area of Mahur River — lapsed, 12.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.