Quick answers
What is Rukni River Sand Minor Mineral Unit (Ramprasadpur)?
Rukni River Sand Minor Mineral Unit (Ramprasadpur) is an approved mining project in Dulalgram, Udarbond, Cachar, Assam. The site covers 9.1 acres.
Who is building it?
The applicant is Dfo Cachar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Apr 2025), as of 27 Nov 2026.
Where is it?
In Dulalgram, Udarbond, Cachar, Assam.
How big is it?
It has a stated cost of ₹50 lakh and a site of 9.1 acres.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Apr 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dfo Cachar |
| Land area | 9.1 acres (3.7 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Dulalgram |
| Taluk / tehsil | Udarbond |
| District | Cachar |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00823 |
In context
95 applications in Cachar since January 2022 are in the same category (Mining): 78 approved, 4 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.1 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Dulalgram, Udarbond, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Minor Mineral Unit (Sand) (Saptagram) on Rukni River Bed — environmental approval granted, 4.2 km away
- Patta Land Ordinary Earth Mining Permit Area — lapsed, 4.3 km away
- Exploratory drilling for Forest Location TNAA by A&AA Basin ,ONGC — environmental approval granted, 6.6 km away
- Road from Jarailtala Khasia Punjee to Jarailtala FV — lapsed, 7.8 km away
- Road from Chandrapur to Darmikhal Riyang Punji — lapsed, 8.6 km away
- Road from Rajnikhal to Suparikhal via Gurudayalpur (MRL07) — lapsed, 9.7 km away
- Proposed Sonai Irrigation Project ,Taluka Silchar, District Cacher, Assam by… — cleared for impact study, 9.9 km away
- Road from 4th KM Dwarbond Pratappur Road to Nagathal FV — lapsed, 10.5 km away
More from Dfo Cachar in Cachar
- Madhura River Stone Quarry Block No. 1 — more information requested
- Govt. Permit Area of Chiri River Minor Miner Unit-2(Stone) — withdrawn
- Govt. Permit Area of Chiri River Minor Mineral Unit- 3(Stone) — withdrawn
- Govt. Permit Area of Chiri River Minor Mineral Unit- 3(Stone) — environmental approval granted
- Govt. Permit Area of Chiri River Minor Mineral Unit-4(Stone) — environmental approval granted
- Jatinga River Minor Mineral Unit - 3 (Stone) — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.