Quick answers
What is Madhura River Stone Quarry Block No. 1?
Madhura River Stone Quarry Block No. 1 is a proposed mining project in North C>Ch>R Reserved Forest, Silchar, Cachar, Assam. The site covers 12.3 acres.
Who is building it?
The applicant is Dfo Cachar.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In North C>Ch>R Reserved Forest, Silchar, Cachar, Assam.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 12.3 acres.
When was it filed?
The application was filed on 28 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Madhura River Stone Quarry Block No. 1
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Sept 2026 |
| Application filed | 28 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Dfo Cachar |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | North C>Ch>R Reserved Forest |
| Taluk / tehsil | Silchar |
| District | Cachar |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01613 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 28 Aug 2026 (this page) | More information requested | 12.3 acres | ₹1.3 crore |
| New project filed 5 Jul 2024 | Environmental approval granted | 12.3 acres | ₹1.3 crore |
In context
95 applications in Cachar since January 2022 are in the same category (Mining): 78 approved, 4 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.3 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
North C>Ch>R Reserved Forest, Silchar, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Madhura River Stone Quarry Block No.1 — environmental approval granted, 0 m away
- Madhura River Stone Quarry Block No. 1 — environmental approval granted, 0 m away
- Patta Land Stone Materials Mining Permit Area at Madhupur Mouza — environmental approval granted, 1000 m away
- Patta Land Stone Materials Mining Permit Area at Madhupur Mouza — environmental approval granted, 1000 m away
- Madhupur Part-I P.P. Land Stone Mining Permit Area — environmental approval granted, 1.2 km away
- Patta Land Stone Mining Permit Area at Madhupur Part-I Mouza — environmental approval granted, 1.4 km away
- Madhura River Stone Quarry Block No.2 — environmental approval granted, 1.8 km away
- Madhura River Stone Quarry Block No.2 — environmental approval granted, 1.8 km away
More from Dfo Cachar in Cachar
- Govt. Permit Area of Chiri River Minor Miner Unit-2(Stone) — withdrawn
- Govt. Permit Area of Chiri River Minor Mineral Unit- 3(Stone) — withdrawn
- Govt. Permit Area of Chiri River Minor Mineral Unit- 3(Stone) — environmental approval granted
- Govt. Permit Area of Chiri River Minor Mineral Unit-4(Stone) — environmental approval granted
- Jatinga River Minor Mineral Unit - 3 (Stone) — environmental approval granted
- Rukni River Sand Minor Mineral Unit (Ramprasadpur) — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.