Quick answers
What is Dubapara P.P. Land Ordinary Earth Mining Permit Area?
Dubapara P.P. Land Ordinary Earth Mining Permit Area is a lapsed mining project in Pkuturipara, Matia, Goalpara, Assam. The site covers 1.3 acres.
Who is building it?
The applicant is Giyas Uddin.
Has it been approved?
No. The application was lapsed on 8 Feb 2025, so it is no longer under consideration.
Where is it?
In Pkuturipara, Matia, Goalpara, Assam.
How big is it?
It has a stated cost of ₹2 lakh and a site of 1.3 acres.
When was it filed?
The application was filed on 27 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Feb 2025 |
| Application filed | 27 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Giyas Uddin |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Pkuturipara |
| Taluk / tehsil | Matia |
| District | Goalpara |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00926 |
In context
46 applications in Goalpara since January 2022 are in the same category (Mining): 37 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.3 acres, this one is smaller than 98% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Pkuturipara, Matia, Goalpara, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Balbala Sand Mining Permit Area No. 2 — lapsed, 2.1 km away
- Rakhyasini Pahar Village Patta Land Ordinary Earth Minning Permit Area — under environmental review, 2.4 km away
- Dakaidal Village Patta Land Ordinary Earth Mining Permit Area — environmental approval granted, 4.1 km away
- 350 TPD Pulp Manufacturing Unit & 16 MW Co-Generation Power Plant — lapsed, 4.7 km away
- Application for Obtaining No Increase in Pollution Load Certificate for… — initial checks, 4.8 km away
- Application for Obtaining No Increase in Pollution Load Certificate for… — initial checks, 4.8 km away
- Solid Waste Management Plant — lapsed, 5.1 km away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 250 KLPD to… — initial checks, 5.7 km away