Quick answers
What is this project?
North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) is a proposed mining project in Na, Silonijan, Dima Hasao, Assam. The site covers 494.2 acres.
Who is building it?
The applicant is Dalmia Bharat Green Vision Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Aug 2025), as of 27 Nov 2026.
Where is it?
In Na, Silonijan, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹10 crore and a site of 494.2 acres.
When was it filed?
The application was filed on 14 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha)
Project details
| Official title | North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) at village Boro Lakhindong, Tehsil/Taluka Umrangsho, Dima Hasao District, Assam of Dalmia Bharat Green Vision Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 Aug 2025 |
| Application filed | 14 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dalmia Bharat Green Vision Limited |
| Land area | 494.2 acres (200 ha) |
| Project cost | ₹10 crore |
| Village / locality | Na |
| Taluk / tehsil | Silonijan |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01396 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Nov 2025 | Environmental approval granted | 494.2 acres | ₹10 crore |
| Early planning filed 14 Aug 2025 (this page) | Cleared for impact study | 494.2 acres | ₹10 crore |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 494.2 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Na, Silonijan, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) — environmental approval granted, 0 m away
- Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area:… — environmental approval granted, 1 km away
- Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area:… — cleared for impact study, 1 km away
- Proposed South Boro Hundong Limestone Block (Part - A) Auctioned Block Area:… — cleared for impact study, 1.2 km away
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — cleared for impact study, 1.8 km away
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — returned to applicant, 1.9 km away
- Proposed South Boro Hundong Limestone Block (Part - B) Auctioned Block Area:… — cleared for impact study, 1.9 km away
- Proposed South Boro Hundong Limestone Block (Part – C) Auctioned Block Area:… — environmental approval granted, 2.9 km away
All 14 Dalmia Bharat Green Vision projects across India