Quick answers
What is this project?
Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area: 188.498 ha with Limestone Production Capacity 6.0 Million TPA, Waste (OB/IB): 2.8 Million TPA & Top Soil: 0.076 Million TPA (Total Excavation: 8.876 Million TPA) by Star Cement Limited is a proposed mining project in Na, Silonijan, Dima Hasao, Assam. The site covers 465.8 acres.
Who is building it?
The applicant is Star Cement Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Mar 2026), as of 27 Nov 2026.
Where is it?
In Na, Silonijan, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹102 crore and a site of 465.8 acres.
When was it filed?
The application was filed on 18 Mar 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area: 188.498 ha…
Project details
| Official title | Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area: 188.498 ha with Limestone Production Capacity 6.0 Million TPA, Waste (OB/IB): 2.8 Million TPA & Top Soil: 0.076 Million TPA (Total Excavation: 8.876 Million TPA) located at Village: Boro Lakhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by Star Cement Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 20 Mar 2026 |
| Application filed | 18 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Star Cement Limited |
| Land area | 465.8 acres (188.5 ha) |
| Project cost | ₹102 crore |
| Village / locality | Na |
| Taluk / tehsil | Silonijan |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01661 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Aug 2026 | Environmental approval granted | 465.8 acres | ₹102 crore |
| Early planning filed 18 Mar 2026 (this page) | Cleared for impact study | 465.8 acres | ₹102 crore |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 465.8 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Na, Silonijan, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area:… — environmental approval granted, 0 m away
- North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) — environmental approval granted, 1 km away
- North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) — cleared for impact study, 1 km away
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — returned to applicant, 1.2 km away
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — cleared for impact study, 1.4 km away
- Proposed South Boro Hundong Limestone Block (Part - A) Auctioned Block Area:… — cleared for impact study, 1.9 km away
- Proposed South Boro Hundong Limestone Block (Part - B) Auctioned Block Area:… — cleared for impact study, 2.6 km away
- Proposed South Boro Hundong Limestone Block (Part – C) Auctioned Block Area:… — environmental approval granted, 3.6 km away
More from Star Cement Limited in Dima Hasao
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — cleared for impact study
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — returned to applicant
4 Star Cement projects in Dima Hasao
All 15 Star Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.