Cleared for impact studyMining · Dima Hasao, Assam

New Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top Soil: 0.020 Million TPA, Waste/OB: 0.303 Million TPA and Mineral Reject: 0.120 Million TPA (Total Excavation: 1.124 Million TPA) by M/s. JK Lakshmi Cement Limited

New Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top Soil: 0.020 Million TPA, Waste/OB: 0.303 Million TPA and Mineral Reject: 0.120 Million TPA (Total Excavation: 1.124 Million TPA) by M/s. JK Lakshmi Cement Limited is a proposed mining project in Ram Rangpi, Silonijan, Dima Hasao, Assam. The site covers 494.2 acres. Its stated project cost is ₹60 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Jul 2026).

See it on the live map All projects in Dima Hasao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

New Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top Soil: 0.020 Million TPA, Waste/OB: 0.303 Million TPA and Mineral Reject: 0.120 Million TPA (Total Excavation: 1.124 Million TPA) by M/s. JK Lakshmi Cement Limited is a proposed mining project in Ram Rangpi, Silonijan, Dima Hasao, Assam. The site covers 494.2 acres.

Who is building it?

The applicant is Jk Lakshmi Cement Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Jul 2026), as of 27 Nov 2026.

Where is it?

In Ram Rangpi, Silonijan, Dima Hasao, Assam.

How big is it?

It has a stated cost of ₹60 crore and a site of 494.2 acres.

When was it filed?

The application was filed on 31 Jul 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: New Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681…

Project details

Official titleNew Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top Soil: 0.020 Million TPA, Waste/OB: 0.303 Million TPA and Mineral Reject: 0.120 Million TPA (Total Excavation: 1.124 Million TPA) by M/s. JK Lakshmi Cement Limited located at Village: Umrangso 18 Kilo, Tehsil: Umrangso, District: Dima Hasao, Assam.
StatusCleared for impact study
Status since31 Jul 2026
Application filed31 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJk Lakshmi Cement Limited
Land area494.2 acres (200 ha)
Project cost₹60 crore
Village / localityRam Rangpi
Taluk / tehsilSilonijan
DistrictDima Hasao
StateAssam
Location fromSite boundary on record
Our referenceWID-AS-01703

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Oct 2026Environmental approval granted494.2 acres₹60 crore
Early planning filed 31 Jul 2026 (this page)Cleared for impact study494.2 acres₹60 crore

In context

90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 494.2 acres, this one is larger than 89% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 988.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.

Where it is

Ram Rangpi, Silonijan, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jk Lakshmi Cement Limited in Dima Hasao

6 Jk Lakshmi Cement projects in Dima Hasao
All 38 Jk Lakshmi Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.