Quick answers
What is this project?
New Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity: 0.891 Million TPA, Topsoil: 0.021 Million TPA and Waste/OB: 0.475 Million TPA (Total Excavation: 1.387 Million TPA) by Assam Mineral Development Corporation Limited is a proposed mining project in Na, Silonijan, Dima Hasao, Assam. The site covers 76.6 acres.
Who is building it?
The applicant is Assam Mineral Development Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Na, Silonijan, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹8.5 crore and a site of 76.6 acres.
When was it filed?
The application was filed on 28 Sept 2026.
Project details
| Official title | New Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity: 0.891 Million TPA, Topsoil: 0.021 Million TPA and Waste/OB: 0.475 Million TPA (Total Excavation: 1.387 Million TPA) by Assam Mineral Development Corporation Limited located at Village: Umrangso (Umrangso 19 Km), Tehsil: Umrangso, District: Dima Hasao, Assam. |
|---|---|
| Status | Under environmental review |
| Status since | 2 Oct 2026 |
| Application filed | 28 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Assam Mineral Development Corporation Limited |
| Land area | 76.6 acres (31 ha) |
| Project cost | ₹8.5 crore |
| Village / locality | Na |
| Taluk / tehsil | Silonijan |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01650 |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 76.6 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Na, Silonijan, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Umrangso Limestone Block (Area: 200 ha) with Limestone Production… — environmental approval granted, 750 m away
- New Umrangso Limestone Block (Area: 200 ha) with Limestone Production… — cleared for impact study, 750 m away
- M/s ASSAM MINERAL DEVELOPMENT CORPORATION LTD, NEW UMRANGSHU LIMESTONE MINE,… — environmental approval granted, 850 m away
- M/s ASSAM MINERAL DEVELOPMENT CORPORATION LTD, NEW UMRANGSHU LIMESTONE MINE,… — environmental approval granted, 900 m away
- M/s ASSAM MINERAL DEVELOPMENT CORPORATION LTD, NEW UMRANGSHU LIMESTONE MINE,… — cleared for impact study, 900 m away
- Integrated Cement Plant with production capacity of Clinker (0.95 Million… — environmental approval granted, 1.5 km away
- Integrated Cement Plant with production capacity of Clinker (0.95 Million… — cleared for impact study, 1.5 km away
- New Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity:… — under environmental review, 1.6 km away
More from Assam Mineral Development Corporation Limited in Dima Hasao
- New Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity:… — under environmental review
- Garampani Coal Mine — lapsed
- Garampani Coal Mine — cleared for impact study
7 Assam Mineral Development Corporation projects in Dima Hasao
All 21 Assam Mineral Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.