What is Developing? Open the mapMap

Cleared for impact studyMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 55 Ha at Bhojpur Ghat 05 on Son River of District-Bhojpur State-Bihar.

Proposed Sand Mining Project of Area 55 Ha at Bhojpur Ghat 05 on Son River of District-Bhojpur State-Bihar is a proposed mining project in Dhandiha, Koilwar, Bhojpur, Bihar. The site covers 135.9 acres. Its stated project cost is ₹16.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 23 Nov 2023).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 55 Ha at Bhojpur Ghat 05 on Son River of District-Bhojpur State-Bihar is a proposed mining project in Dhandiha, Koilwar, Bhojpur, Bihar. The site covers 135.9 acres.

Who is building it?

The applicant is Sunita Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.

Where is it?

In Dhandiha, Koilwar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹16.9 crore and a site of 135.9 acres.

When was it filed?

The application was filed on 23 Nov 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 55 Ha at Bhojpur Ghat 05 on Son River of…

Project details

StatusCleared for impact study
Status since23 Nov 2023
Application filed23 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSunita Singh
Land area135.9 acres (55 ha)
Project cost₹16.9 crore
Village / localityDhandiha
Taluk / tehsilKoilwar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00003

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 23 Nov 2023 (this page)Cleared for impact study135.9 acres₹16.9 crore
New project filed 10 Aug 2023Environmental approval granted135.9 acres₹16.9 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 135.9 acres, this one is larger than 79% of them.

No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.

Where it is

Dhandiha, Koilwar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sunita Singh in Bhojpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.