What is Developing? Open the mapMap

Cleared for impact studyMining · Bhojpur, Bihar

Sand Ghat Mining Project (Bhoj Son 04 Sand Ghat) at Riverbed Of Son River

Sand Ghat Mining Project (Bhoj Son 04 Sand Ghat) at Riverbed Of Son River is a proposed mining project in Suraudha, Koilwar, Bhojpur, Bihar. The site covers 32.1 acres. Its stated project cost is ₹4 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 23 Nov 2023).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Ghat Mining Project (Bhoj Son 04 Sand Ghat) at Riverbed Of Son River is a proposed mining project in Suraudha, Koilwar, Bhojpur, Bihar. The site covers 32.1 acres.

Who is building it?

The applicant is Pintu Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.

Where is it?

In Suraudha, Koilwar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹4 lakh and a site of 32.1 acres.

When was it filed?

The application was filed on 23 Nov 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Ghat Mining Project (Bhoj Son 04 Sand Ghat) at Riverbed Of Son River

Project details

StatusCleared for impact study
Status since23 Nov 2023
Application filed23 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantPintu Kumar
Land area32.1 acres (13 ha)
Project cost₹4 lakh
Village / localitySuraudha
Taluk / tehsilKoilwar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00052

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 23 Nov 2023 (this page)Cleared for impact study32.1 acres₹4 lakh
New project filed 15 Aug 2023Environmental approval granted32.1 acres₹4 lakh

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 32.1 acres, this one is smaller than 82% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Suraudha, Koilwar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.