Quick answers
What is this project?
Sand Mining Project, Falgu River (Block No.- 05) Sand Ghat of District- Gaya, State-Bihar is a proposed mining project in Baraini Gp, Belaganj, Gaya, Bihar. The site covers 93.9 acres.
Who is building it?
The applicant is M/S Rajendra Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 May 2023), as of 27 Nov 2026.
Where is it?
In Baraini Gp, Belaganj, Gaya, Bihar.
How big is it?
It has a stated cost of ₹11.7 crore and a site of 93.9 acres.
When was it filed?
The application was filed on 25 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 May 2023 |
| Application filed | 25 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Rajendra Singh |
| Land area | 93.9 acres (38 ha) |
| Project cost | ₹11.7 crore |
| Village / locality | Baraini Gp |
| Taluk / tehsil | Belaganj |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00070 |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 93.9 acres, this one is larger than 90% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Baraini Gp, Belaganj, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Falgu River (Block No.- 04) Sand Ghat of District- Gaya,… — environmental approval granted, 1.2 km away
- Sand Mining Project, Falgu River (Block No.- 04) Sand Ghat of District- Gaya,… — cleared for impact study, 1.2 km away
- Proposed Brick Earth Mining for M/S S.N. InIt Udyog - Bhindaspur Soil Brick… — environmental approval granted, 2.5 km away
- Brick Earth Mining for M/S Sun Int Udyog- Bithraura Soil Brick Mining Project… — environmental approval granted, 2.7 km away
- Sand Mining Project, Falgu River (Block No.- 07) Sand Ghat of District- Gaya,… — cleared for impact study, 2.7 km away
- Sand Mining Project, Falgu River (Block No.- 07) Sand Ghat of District- Gaya,… — environmental approval granted, 2.8 km away
- Sand Mining Project, Falgu River (Block No.- 08) Sand Ghat of District- Gaya,… — cleared for impact study, 3.7 km away
- Sand Mining Project, Falgu River (Block No.- 08) Sand Ghat of District- Gaya,… — environmental approval granted, 3.7 km away
More from M/S Rajendra Singh in Gaya
- Sand Mining Project, Block-25 (Gaya Morhar – 12) Sand Ghat of District- Gaya,… — environmental approval granted
- Sand Mining Project, Block-25 (Gaya Morhar – 12) Sand Ghat of District- Gaya,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.