What is Developing? Open the mapMap

Environmental approval grantedMining · Gaya, Bihar

Sand Mining Project, Falgu River (Block No.- 04) Sand Ghat of District- Gaya, State-Bihar.

Sand Mining Project, Falgu River (Block No.- 04) Sand Ghat of District- Gaya, State-Bihar is an approved mining project in Degawan, Khizirsarai, Gaya, Bihar. The site covers 34.6 acres. Its stated project cost is ₹4.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Sept 2023).

See it on the live map All projects in Gaya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project, Falgu River (Block No.- 04) Sand Ghat of District- Gaya, State-Bihar is an approved mining project in Degawan, Khizirsarai, Gaya, Bihar. The site covers 34.6 acres.

Who is building it?

The applicant is Siyaram Construction.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Sept 2023), as of 27 Nov 2026.

Where is it?

In Degawan, Khizirsarai, Gaya, Bihar.

How big is it?

It has a stated cost of ₹4.4 crore and a site of 34.6 acres.

When was it filed?

The application was filed on 13 Sept 2023.

Project details

StatusEnvironmental approval granted
Status since13 Sept 2023
Application filed13 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSiyaram Construction
Land area34.6 acres (14 ha)
Project cost₹4.4 crore
Village / localityDegawan
Taluk / tehsilKhizirsarai
DistrictGaya
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00514

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Sept 2023 (this page)Environmental approval granted34.6 acres₹4.4 crore
Early planning filed 4 May 2023Cleared for impact study34.6 acres₹4.4 crore

In context

189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 34.6 acres, this one is larger than 71% of them.

No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.

Where it is

Degawan, Khizirsarai, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 6 Siyaram Construction projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.