Quick answers
What is this project?
Proposed Sand Mining Project of Area 55 Ha at Bhojpur Ghat 28 on Sone River of District-Bhojpur State-Bihar is an approved mining project in Bansi Dehri, Sahar, Bhojpur, Bihar. The site covers 135.9 acres.
Who is building it?
The applicant is Bijendra Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Sept 2023), as of 27 Nov 2026.
Where is it?
In Bansi Dehri, Sahar, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹16.9 crore and a site of 135.9 acres.
When was it filed?
The application was filed on 5 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Sept 2023 |
| Application filed | 5 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bijendra Kumar |
| Land area | 135.9 acres (55 ha) |
| Project cost | ₹16.9 crore |
| Village / locality | Bansi Dehri |
| Taluk / tehsil | Sahar |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00208 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 135.9 acres | ₹16.9 crore |
| New project filed 5 Sept 2023 (this page) | Environmental approval granted | 135.9 acres | ₹16.9 crore |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 135.9 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Bansi Dehri, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 55 Ha at Bhojpur Ghat 28 on Sone River of… — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29A on Sone River of… — environmental approval granted, 550 m away
- Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29A on Sone River of… — cleared for impact study, 550 m away
- Proposed Sand Mining Project BHOJ SON- 27 C on Sone River of District-… — environmental approval granted, 600 m away
- Proposed Sand Mining Project BHOJ SON- 27 C on Sone River of District-… — cleared for impact study, 600 m away
- Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29B on Sone River of… — environmental approval granted, 850 m away
- Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29B on Sone River of… — cleared for impact study, 850 m away
- Proposed Sand Mining Project of Area 23.0 Ha at BHOJ SON- 27B on Sone River of… — environmental approval granted, 1000 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.