Environmental approval grantedMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29B on Sone River of District- Bhojpur, State- Bihar

Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29B on Sone River of District- Bhojpur, State- Bihar is an approved mining project in Peur Chak, Sahar, Bhojpur, Bihar. The site covers 66.7 acres. Its stated project cost is ₹11.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 27 Mar 2026).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29B on Sone River of District- Bhojpur, State- Bihar is an approved mining project in Peur Chak, Sahar, Bhojpur, Bihar. The site covers 66.7 acres.

Who is building it?

The applicant is Rishav Raj Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 27 Mar 2026), as of 27 Nov 2026.

Where is it?

In Peur Chak, Sahar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹11.9 crore and a site of 66.7 acres.

When was it filed?

The application was filed on 6 Mar 2026.

Project details

StatusEnvironmental approval granted
Status since27 Mar 2026
Application filed6 Mar 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRishav Raj Singh
Land area66.7 acres (27 ha)
Project cost₹11.9 crore
Village / localityPeur Chak
Taluk / tehsilSahar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02029

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Mar 2026 (this page)Environmental approval granted66.7 acres₹11.9 crore
Early planning filed 11 Nov 2025Cleared for impact study66.7 acres₹11.9 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 66.7 acres, this one is smaller than 57% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 279.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Peur Chak, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.