What is Developing? Open the mapMap

Cleared for impact studyMining · Pashchim Champaran, Bihar

Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak, District- West Champaran (Bettiah), State – Bihar.

Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak, District- West Champaran (Bettiah), State – Bihar is a proposed mining project in Piprasi, Madhubani, Pashchim Champaran, Bihar. The site covers 73 acres. Its stated project cost is ₹1.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Apr 2023).

See it on the live map All projects in Pashchim Champaran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak, District- West Champaran (Bettiah), State – Bihar is a proposed mining project in Piprasi, Madhubani, Pashchim Champaran, Bihar. The site covers 73 acres.

Who is building it?

The applicant is Ujjain Engicon India Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Apr 2023), as of 27 Nov 2026.

Where is it?

In Piprasi, Madhubani, Pashchim Champaran, Bihar.

How big is it?

It has a stated cost of ₹1.9 crore and a site of 73 acres.

When was it filed?

The application was filed on 6 Apr 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak,…

Project details

StatusCleared for impact study
Status since6 Apr 2023
Application filed6 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUjjain Engicon India Private Limited
Land area73 acres (29.5 ha)
Project cost₹1.9 crore
Village / localityPiprasi
Taluk / tehsilMadhubani
DistrictPashchim Champaran
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00260

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Feb 2024Environmental approval granted73 acres₹1.9 crore
Early planning filed 6 Apr 2023 (this page)Cleared for impact study73 acres₹1.9 crore

In context

35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 73 acres, this one is larger than 94% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Piprasi, Madhubani, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.