What is Developing? Open the mapMap

Environmental approval grantedMining · Pashchim Champaran, Bihar

Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak, District- West Champaran (Bettiah), State – Bihar.

Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak, District- West Champaran (Bettiah), State – Bihar is an approved mining project in Piprasi, Madhubani, Pashchim Champaran, Bihar. The site covers 73 acres. Its stated project cost is ₹1.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 14 Mar 2024).

See it on the live map All projects in Pashchim Champaran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on River Gandak, District- West Champaran (Bettiah), State – Bihar is an approved mining project in Piprasi, Madhubani, Pashchim Champaran, Bihar. The site covers 73 acres.

Who is building it?

The applicant is Ujjain Engicon India Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 14 Mar 2024), as of 27 Nov 2026.

Where is it?

In Piprasi, Madhubani, Pashchim Champaran, Bihar.

How big is it?

It has a stated cost of ₹1.9 crore and a site of 73 acres.

When was it filed?

The application was filed on 3 Feb 2024.

Project details

StatusEnvironmental approval granted
Status since14 Mar 2024
Application filed3 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantUjjain Engicon India Private Limited
Land area73 acres (29.5 ha)
Project cost₹1.9 crore
Village / localityPiprasi
Taluk / tehsilMadhubani
DistrictPashchim Champaran
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00571

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Feb 2024 (this page)Environmental approval granted73 acres₹1.9 crore
Early planning filed 6 Apr 2023Cleared for impact study73 acres₹1.9 crore

In context

35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 73 acres, this one is larger than 94% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Piprasi, Madhubani, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.