Quick answers
What is this project?
Sand Ghat Mining Project (Badua Unit No.- 03 Sand Ghat) at Riverbed of Badua River is an approved mining project in Chandwari, Chanan, Banka, Bihar. The site covers 66.7 acres.
Who is building it?
The applicant is Meticulous Organics Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Aug 2023), as of 27 Nov 2026.
Where is it?
In Chandwari, Chanan, Banka, Bihar.
How big is it?
It has a stated cost of ₹3.1 crore and a site of 66.7 acres.
When was it filed?
The application was filed on 21 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Aug 2023 |
| Application filed | 21 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Meticulous Organics Private Limited |
| Land area | 66.7 acres (27 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Chandwari |
| Taluk / tehsil | Chanan |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00320 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Aug 2023 (this page) | Environmental approval granted | 66.7 acres | ₹3.1 crore |
| Early planning filed 8 Feb 2023 | Cleared for impact study | 66.7 acres | ₹3.1 crore |
In context
32 applications in Banka since January 2022 are in the same category (Mining): 24 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 66.7 acres, this one is smaller than 62% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Chandwari, Chanan, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Badua Unit No.- 03 Sand Ghat) at Riverbed of Badua… — cleared for impact study, 0 m away
- Telecom project by Jio Digital Fibre Pvt. Ltd. — lapsed, 7.9 km away
- Forest Clearance for Widening and Strengthening of Sultanganj-Tarapur… — lapsed, 8.5 km away
- Diversion of 0.01425 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 10 km away
- Grid Connectivity to villages of Chanan and Belhar Block of Banka District — more information requested, 10.9 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location In… — forest land use approved, 12.4 km away
- Jhajha to Tola Tamoliya OFC Laying 41.1 Km. by JDFPL — more information requested, 13 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Within 8… — forest land use approved, 13.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.