Quick answers
What is this project?
Grid Connectivity to villages of Chanan and Belhar Block of Banka District is a proposed power project in Tola Raino Jharna, Chanan, Banka, Bihar. The site covers 2.8 acres.
Who is building it?
The applicant is South Bihar Power Distribution Company Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Tola Raino Jharna, Chanan, Banka, Bihar.
How big is it?
It has a stated cost of ₹1.7 crore; a site of 2.8 acres and 2 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 26 Mar 2026.
Project details
| Official title | Grid Connectivity to villages of Chanan and Belhar Block of Banka District Under RDSS Scheme |
|---|---|
| Status | More information requested |
| Status since | 15 Oct 2026 |
| Application filed | 26 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | South Bihar Power Distribution Company Limited |
| Land area | 2.8 acres (1.1 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Tola Raino Jharna |
| Taluk / tehsil | Chanan |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03398 |
In context
5 applications in Banka since January 2022 are in the same category (Power): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tola Raino Jharna, Chanan, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jhajha to Tola Tamoliya OFC Laying 41.1 Km. by JDFPL — more information requested, 3 km away
- Sand Ghat Mining Project (Badua Unit No.- 03 Sand Ghat) at Riverbed of Badua… — environmental approval granted, 10.9 km away
- Sand Ghat Mining Project (Badua Unit No.- 03 Sand Ghat) at Riverbed of Badua… — cleared for impact study, 10.9 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location In… — forest land use approved, 12.3 km away
- Retail out-let dealership of Bio Diesel M/s Hinduja Petrolium (A Unit of GIBPP… — under forest review, 12.6 km away
- 33KV New Line Under State Plan — lapsed, 13.7 km away
- Forest Clearance for Widening and Strengthening of Sultanganj-Tarapur… — lapsed, 14 km away
- 33KV Lines on Overhead Wolf Conductor From Tonapathar Gss to Under Constructed… — more information requested, 14 km away
More from South Bihar Power Distribution Company Limited in Banka
- 33KV Lines on Overhead Wolf Conductor From Tonapathar Gss to Under Constructed… — more information requested
- 33KV New Line Under State Plan — lapsed
3 South Bihar Power projects in Banka
All 32 South Bihar Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.