Quick answers
What is this project?
Sand Ghat Mining Project (Jamui Kiul Block - 12) at Riverbed of Kiul River is an approved mining project in Garo Nawada, Jamui, Bihar. The site covers 23.3 acres.
Who is building it?
The applicant is Ashutosh Anand.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Mar 2024), as of 27 Nov 2026.
Where is it?
In Garo Nawada, Jamui, Bihar.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 23.3 acres.
When was it filed?
The application was filed on 2 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Mar 2024 |
| Application filed | 2 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashutosh Anand |
| Land area | 23.3 acres (9.4 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Garo Nawada |
| Taluk / tehsil | Jamui |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00344 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Feb 2024 (this page) | Environmental approval granted | 23.3 acres | ₹1.1 crore |
| Early planning filed 23 Jan 2023 | Cleared for impact study | 23.3 acres | ₹1.1 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 23.3 acres, this one is larger than 54% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Garo Nawada, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Jamui Kiul Block - 12) at Riverbed of Kiul River — cleared for impact study, 0 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 11 Sand Ghat) at Riverbed of Kiul… — environmental approval granted, 550 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 11 Sand Ghat) at Riverbed of Kiul… — cleared for impact study, 550 m away
- Proposed Sand Mining Project of Area 65.9 Ha at Kiul River Block -13,… — environmental approval granted, 1.8 km away
- Proposed Sand Mining Project of Area 65.9 Ha at Kiul River Block -13,… — cleared for impact study, 1.8 km away
- Transfer of Environmental Clearance for Sand Mining Project on Jamui Sand Ghat… — more information requested, 2.3 km away
- Sand Ghat Mining Project (Ulai River Block No.- 09 Sand Ghat) at Riverbed of… — environmental approval granted, 2.3 km away
- Sand Ghat Mining Project (Ulai River Block No.- 09 Sand Ghat) at Riverbed of… — cleared for impact study, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.