Cleared for impact studyMining · Pashchim Champaran, Bihar

Proposed Sand Mining Project of Area 11.13 Ha at Sand Ghat Unit No.-11 on river Masan (Pipra Ghat) Masan (Mahui Ghat), Maniyari (Bhaathuhawa Ghat), Harbora (Bairia Ghat), Biraha (Pakri Ghat), Biraha (Sirhwa Ghat) District: West Champaran (Bettiah), State – Bihar.

Proposed Sand Mining Project of Area 11.13 Ha at Sand Ghat Unit No.-11 on river Masan (Pipra Ghat) Masan (Mahui Ghat), Maniyari (Bhaathuhawa Ghat), Harbora (Bairia Ghat), Biraha (Pakri Ghat), Biraha (Sirhwa Ghat) District: West Champaran (Bettiah), State – Bihar is a proposed mining project in Mahui, Ramnagar, Pashchim Champaran, Bihar. The site covers 27.5 acres. Its stated project cost is ₹8.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Aug 2023).

See it on the live map All projects in Pashchim Champaran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 11.13 Ha at Sand Ghat Unit No.-11 on river Masan (Pipra Ghat) Masan (Mahui Ghat), Maniyari (Bhaathuhawa Ghat), Harbora (Bairia Ghat), Biraha (Pakri Ghat), Biraha (Sirhwa Ghat) District: West Champaran (Bettiah), State – Bihar is a proposed mining project in Mahui, Ramnagar, Pashchim Champaran, Bihar. The site covers 27.5 acres.

Who is building it?

The applicant is Navneet Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 14 Aug 2023), as of 27 Nov 2026.

Where is it?

In Mahui, Ramnagar, Pashchim Champaran, Bihar.

How big is it?

It has a stated cost of ₹8.7 crore and a site of 27.5 acres.

When was it filed?

The application was filed on 14 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 11.13 Ha at Sand Ghat Unit No.-11 on river Masan…

Project details

StatusCleared for impact study
Status since14 Aug 2023
Application filed14 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantNavneet Kumar
Land area27.5 acres (11.1 ha)
Project cost₹8.7 crore
Village / localityMahui
Taluk / tehsilRamnagar
DistrictPashchim Champaran
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00360

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 May 2024Environmental approval granted27.5 acres₹8.7 crore
Early planning filed 14 Aug 2023 (this page)Cleared for impact study27.5 acres₹8.7 crore

In context

35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 27.5 acres, this one is larger than 86% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Mahui, Ramnagar, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.