Quick answers
What is this project?
Proposed Sand Mining Project of Area 11.13 Ha at Sand Ghat Unit No.-11 on river Masan (Pipra Ghat) Masan (Mahui Ghat), Maniyari (Bhaathuhawa Ghat), Harbora (Bairia Ghat), Biraha (Pakri Ghat), Biraha (Sirhwa Ghat) District: West Champaran (Bettiah), State – Bihar is an approved mining project in Mahui, Ramnagar, Pashchim Champaran, Bihar. The site covers 27.5 acres.
Who is building it?
The applicant is Navneet Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jul 2024), as of 27 Nov 2026.
Where is it?
In Mahui, Ramnagar, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹8.7 crore and a site of 27.5 acres.
When was it filed?
The application was filed on 15 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jul 2024 |
| Application filed | 15 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Navneet Kumar |
| Land area | 27.5 acres (11.1 ha) |
| Project cost | ₹8.7 crore |
| Village / locality | Mahui |
| Taluk / tehsil | Ramnagar |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00797 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 May 2024 (this page) | Environmental approval granted | 27.5 acres | ₹8.7 crore |
| Early planning filed 14 Aug 2023 | Cleared for impact study | 27.5 acres | ₹8.7 crore |
In context
35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 27.5 acres, this one is larger than 86% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Mahui, Ramnagar, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 11.13 Ha at Sand Ghat Unit No.-11 on… — cleared for impact study, 0 m away
- Proposed Brick Earth Mining for M/S Sona Bandhu Int Udyog Serahwa Soil Brick… — under environmental review, 4.3 km away
- Proposed Brick Earth Mining Project for M/S Sona Int Udyog — under environmental review, 4.6 km away
- Proposed Brick clay mining project at Mauja- Tituhiya, Block: Narkatiyaganj,… — environmental approval granted, 5.4 km away
- Proposed Brick Earth Mining Project for M/S Ajay and Brothers at Mauza- Hardi… — environmental approval granted, 6.8 km away
- Magadh Sugar & Energy Ltd. (Unit : New Swadeshi Sugar Mills) — initial checks, 9.5 km away
- Magadh Sugar & Energy Limited (Unit - New Swadeshi Sugar Mills - Distillery… — initial checks, 9.5 km away
- Magadh Sugar & Energy Ltd. (Unit : New Swadeshi Sugar Mills) — initial checks, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.