Quick answers
What is this project?
Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant to Dual Mode & Expansion to 70 Klpd by HPCL is a proposed industrial project in Lauria, Lauriya, Pashchim Champaran, Bihar. The site covers 105 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Lauria, Lauriya, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹391.3 crore and a site of 105 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Official title | Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant to Dual Mode & Expansion to 70 Klpd Along With New Cogen Plant |
|---|---|
| Status | Initial checks |
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 105 acres (42.5 ha) |
| Project cost | ₹391.3 crore |
| Village / locality | Lauria |
| Taluk / tehsil | Lauriya |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00365 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Sept 2023 (this page) | Initial checks | 105 acres | ₹391.3 crore |
| New project filed 27 Sept 2023 | Initial checks | 105 acres | ₹391.3 crore |
In context
7 applications in Pashchim Champaran since January 2022 are in the same category (Industry): 0 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lauria, Lauriya, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant in to Dual Mode &… — initial checks, 0 m away
- Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant to Dual Mode &… — initial checks, 0 m away
- Proposed Brick Earth Mining for M/S Raj Int Udyog Baghlachna Soil Brick Mining… — under environmental review, 3.8 km away
- Proposed Brick clay mining project at Mauja- Baswariya, Block: Lauriya,… — under environmental review, 6.6 km away
- Proposed Brick Earth Mining Project for M/s M.S Bricks at Mauza- Dhobani, P.O-… — environmental approval granted, 8 km away
- Proposed Brick Earth Mining Project for M/s AKN Int Udyog at Mauza- Baswariya… — environmental approval granted, 11.6 km away
- Proposed Brick Earth Mining Project for M/S Sahu Int Udyog at Mauza- Hichhopal… — initial checks, 11.9 km away
- Proposed Brick clay mining project at Mauja- Tituhiya, Block: Narkatiyaganj,… — environmental approval granted, 12.6 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Pashchim Champaran
3 Hindustan Petroleum Corporation (HPCL) projects in Pashchim Champaran
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.