Quick answers
What is this project?
Proposed Brick clay mining project at Mauja- Baswariya, Block: Lauriya, District: West Champaran & State: Bihar M/s RED INT UDYOG is a proposed mining project in Baswaria, Lauriya, Pashchim Champaran, Bihar. The site covers 3.4 acres.
Who is building it?
The applicant is Aslam Parwez.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Baswaria, Lauriya, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 3.4 acres.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aslam Parwez |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Baswaria |
| Taluk / tehsil | Lauriya |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01729 |
In context
35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 3.4 acres, this one is smaller than 86% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Baswaria, Lauriya, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S Raj Int Udyog Baghlachna Soil Brick Mining… — under environmental review, 5.8 km away
- Proposed Brick clay mining project at Mauja- Tituhiya, Block: Narkatiyaganj,… — environmental approval granted, 6.1 km away
- Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant in to Dual Mode &… — initial checks, 6.6 km away
- Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant to Dual Mode &… — initial checks, 6.6 km away
- Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant to Dual Mode &… — initial checks, 6.6 km away
- Proposed Brick Earth Mining for M/S Sona Bandhu Int Udyog Serahwa Soil Brick… — under environmental review, 7.5 km away
- Proposed Brick Earth Mining Project for M/S Sona Int Udyog — under environmental review, 7.8 km away
- Magadh Sugar & Energy Ltd. (Unit : New Swadeshi Sugar Mills) — initial checks, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.