What is Developing? Open the mapMap

Environmental approval grantedMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 86.0 Ha at Bhojpur Ghat 34 on Sone River of District-Bhojpur State-Bihar

Proposed Sand Mining Project of Area 86.0 Ha at Bhojpur Ghat 34 on Sone River of District-Bhojpur State-Bihar is an approved mining project in Dhauri, Sahar, Bhojpur, Bihar. The site covers 212.5 acres. Its stated project cost is ₹26.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Sept 2023).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 86.0 Ha at Bhojpur Ghat 34 on Sone River of District-Bhojpur State-Bihar is an approved mining project in Dhauri, Sahar, Bhojpur, Bihar. The site covers 212.5 acres.

Who is building it?

The applicant is Accent Minmet Resources Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 Sept 2023), as of 27 Nov 2026.

Where is it?

In Dhauri, Sahar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹26.4 crore and a site of 212.5 acres.

When was it filed?

The application was filed on 8 Sept 2023.

Project details

StatusEnvironmental approval granted
Status since8 Sept 2023
Application filed8 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAccent Minmet Resources Private Limited
Land area212.5 acres (86 ha)
Project cost₹26.4 crore
Village / localityDhauri
Taluk / tehsilSahar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00433

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Sept 2023 (this page)Environmental approval granted212.5 acres₹26.4 crore
Early planning filed 6 Mar 2023Cleared for impact study212.5 acres₹26.4 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 212.5 acres, this one is larger than 91% of them.

No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.

Where it is

Dhauri, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Accent Minmet Resources Private Limited in Bhojpur

All 4 Accent Minmet Resources projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.