What is Developing? Open the mapMap

Cleared for impact studyMining · Bhojpur, Bihar

Sand Mining Project of Area 45.0 Ha at Bhojpur Ghat 36 on Sone River of District-Bhojpur State-Bihar.

Sand Mining Project of Area 45.0 Ha at Bhojpur Ghat 36 on Sone River of District-Bhojpur State-Bihar is a proposed mining project in Kharaon Chaturbhuj, Sahar, Bhojpur, Bihar. The site covers 111.2 acres. Its stated project cost is ₹13.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 15 Mar 2023).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project of Area 45.0 Ha at Bhojpur Ghat 36 on Sone River of District-Bhojpur State-Bihar is a proposed mining project in Kharaon Chaturbhuj, Sahar, Bhojpur, Bihar. The site covers 111.2 acres.

Who is building it?

The applicant is Sushil Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 15 Mar 2023), as of 27 Nov 2026.

Where is it?

In Kharaon Chaturbhuj, Sahar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹13.8 crore and a site of 111.2 acres.

When was it filed?

The application was filed on 15 Mar 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project of Area 45.0 Ha at Bhojpur Ghat 36 on Sone River of District-Bhojpur…

Project details

StatusCleared for impact study
Status since15 Mar 2023
Application filed15 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSushil Kumar
Land area111.2 acres (45 ha)
Project cost₹13.8 crore
Village / localityKharaon Chaturbhuj
Taluk / tehsilSahar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00459

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 Sept 2023Environmental approval granted111.2 acres₹13.8 crore
Early planning filed 15 Mar 2023 (this page)Cleared for impact study111.2 acres₹13.8 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 111.2 acres, this one is larger than 69% of them.

No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.

Where it is

Kharaon Chaturbhuj, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.