Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Sept 2023 |
| Application filed | 29 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nagendra Kumar |
| Land area | 24 acres (9.7 ha) |
| Project cost | ₹62 lakh |
| Village / locality | Kobil |
| Taluk / tehsil | Islampur |
| District | Nalanda |
| State | Bihar |
| Location from | Site area on record |
| Our reference | WID-BR-00454 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Sept 2023 (this page) | Environmental approval granted | 24 acres | ₹62 lakh |
| Early planning filed 1 Jun 2023 | Cleared for impact study | 24 acres | ₹62 lakh |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 24 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Kobil, Islampur, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 9.7 Ha at Nalanda Lokain – 01, Lokain… — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 10.0 Ha at Nalanda Lokain – 02, Lokain… — environmental approval granted, 1.6 km away
- Proposed Sand Mining Project of Area 10.0 Ha at Nalanda Lokain – 02, Lokain… — cleared for impact study, 1.6 km away
- BSNL OFC Laying from Ekangarsarai Telephone Exchange — lapsed, 2.2 km away
- Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 2.7 km away
- Proposed Sand Mining Project of Area 12.0 Ha at Nalanda Lokain – 03, Lokain… — environmental approval granted, 3.4 km away
- Proposed Sand Mining Project of Area 12.0 Ha at Nalanda Lokain – 03, Lokain… — cleared for impact study, 3.4 km away
- Sand Mining Project, Nalanda Cluster-03 Sand Ghat of District- Nalanda,… — environmental approval granted, 3.5 km away
More from Nagendra Kumar in Nalanda
- Brick Earth Mining for M/S Hind Int Udyog- Aadampur Soil Brick Mining Project — environmental approval granted
- Brick Earth Mining for M/S Bandhan Int Udyog-Aadampur Soil Brick Mining Project — environmental approval granted
- Brick Earth Mining for M/S Pankaj Bricks- Maira Barith Soil Brick Mining… — environmental approval granted
- OFC laying in Nalanda District — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.