Project details
| Official title | Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on Khata No.-45, Plot No.-53, Thana No.-38, Mauza-Dariyapur, Thana-Islampur to SH-4 Eakanagarsarai-Islampur Road in Nalanda District of Bihar. |
|---|---|
| Status | Forest land use approved |
| Status since | 8 Dec 2025 |
| Application filed | 11 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Ram Krishna Singh |
| Land area | 2,400 m² |
| Forest land | 150 m² |
| Project cost | ₹80 lakh |
| Village / locality | Daria Pur |
| Taluk / tehsil | Islampur |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03589 |
In context
13 applications in Nalanda since January 2022 are in the same category (Fuel stations): 7 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.6 acres, this one is smaller than 62% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Daria Pur, Islampur, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vodafone Idea telecom infrastructure Ltd (VITIL) optical Fiber Construction… — in-principle approval, conditions pending, 2.5 km away
- BSNL OFC Laying from Ekangarsarai Telephone Exchange — lapsed, 2.6 km away
- Proposed Sand Mining Project of Area 9.7 Ha at Nalanda Lokain – 01, Lokain… — cleared for impact study, 2.7 km away
- Proposed Sand Mining Project of Area 9.7 Ha at Nalanda Lokain – 01, Lokain… — environmental approval granted, 2.7 km away
- Proposed Sand Mining Project of Area 10.0 Ha at Nalanda Lokain – 02, Lokain… — environmental approval granted, 3.8 km away
- Proposed Sand Mining Project of Area 10.0 Ha at Nalanda Lokain – 02, Lokain… — cleared for impact study, 3.8 km away
- Brick Earth Mining for M/S Tata bricks Udyog- Ranipur Soil Brick Mining… — environmental approval granted, 4 km away
- Brick Earth Mining for M/S Nam Int Udyog- Narayanpur Soil Brick Mining Project… — environmental approval granted, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.