Quick answers
What is this project?
Sand Mining Project, Block 46 (Gaya Lilajan 12/13/14/15) Sand Ghat of District- Gaya, State-Bihar is a proposed mining project in Sugasot, Dobhi, Gaya, Bihar. The site covers 139 acres.
Who is building it?
The applicant is M/S Gopal Kumar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Apr 2023), as of 27 Nov 2026.
Where is it?
In Sugasot, Dobhi, Gaya, Bihar.
How big is it?
It has a stated cost of ₹9.2 crore and a site of 139 acres.
When was it filed?
The application was filed on 20 Apr 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Apr 2023 |
| Application filed | 20 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Gopal Kumar Singh |
| Land area | 139 acres (56.3 ha) |
| Project cost | ₹9.2 crore |
| Village / locality | Sugasot |
| Taluk / tehsil | Dobhi |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00481 |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 139 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sugasot, Dobhi, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block 46 (Gaya Lilajan 12/13/14/15) Sand Ghat of… — environmental approval granted, 0 m away
- Brick Earth Mining for M/S Maa Int Udyog (Marka-M B) - Babhandev Soil Brick… — environmental approval granted, 950 m away
- Diversion of 0.0225 ha of forest land for construction of approach road for… — forest land use approved, 1.5 km away
- Integrated Manufacturing Cluster (IMC) at Gaya, Gaya District, Bihar — cleared for impact study, 2.6 km away
- Integrated Manufacturing Cluster (IMC) at Gaya, Gaya District, Bihar — environmental approval granted, 2.6 km away
- Integrated Manufacturing Cluster (IMC) at Gaya, Gaya District, Bihar — cleared for impact study, 2.6 km away
- AKIC Dobhi Project — more information requested, 2.9 km away
- Akic Dobhi Project — lapsed, 2.9 km away
More from M/S Gopal Kumar Singh in Gaya
- Sand Mining Project, Block 46 (Gaya Lilajan 12/13/14/15) Sand Ghat of… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.