Quick answers
What is this project?
Brick Earth Mining for M/S Maa Int Udyog (Marka-M B) - Babhandev Soil Brick Mining Project at Mauza-Babhandev, Village- Mahkampur, P.O- Babhandev, P.S-Barachatti, District- Gaya (Bihar) is an approved mining project in Bariya, Dobhi, Gaya, Bihar. The site covers 4.7 acres.
Who is building it?
The applicant is Yadunandan Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Dec 2025), as of 27 Nov 2026.
Where is it?
In Bariya, Dobhi, Gaya, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 4.7 acres.
When was it filed?
The application was filed on 17 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Dec 2025 |
| Application filed | 17 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yadunandan Singh |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Bariya |
| Taluk / tehsil | Dobhi |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00920 |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.7 acres, this one is smaller than 63% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bariya, Dobhi, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block 46 (Gaya Lilajan 12/13/14/15) Sand Ghat of… — environmental approval granted, 950 m away
- Sand Mining Project, Block 46 (Gaya Lilajan 12/13/14/15) Sand Ghat of… — cleared for impact study, 950 m away
- Integrated Manufacturing Cluster (IMC) at Gaya, Gaya District, Bihar — cleared for impact study, 1.7 km away
- Integrated Manufacturing Cluster (IMC) at Gaya, Gaya District, Bihar — environmental approval granted, 1.7 km away
- Integrated Manufacturing Cluster (IMC) at Gaya, Gaya District, Bihar — cleared for impact study, 1.7 km away
- AKIC Dobhi Project — more information requested, 2 km away
- Akic Dobhi Project — lapsed, 2 km away
- Diversion of 0.0225 ha of forest land for construction of approach road for… — forest land use approved, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.