Quick answers
What is this project?
Sand Mining Project of Area 22.3 Ha at Sand Block-27 (Babhni balu Ghat) on Dhanarjay River of District-Nawada of State-Bihar is a proposed mining project in Amawan, Rajauli, Nawada, Bihar. The site covers 55.1 acres.
Who is building it?
The applicant is Navin Nishchal.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Aug 2023), as of 27 Nov 2026.
Where is it?
In Amawan, Rajauli, Nawada, Bihar.
How big is it?
It has a stated cost of ₹3.4 crore and a site of 55.1 acres.
When was it filed?
The application was filed on 20 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project of Area 22.3 Ha at Sand Block-27 (Babhni balu Ghat) on Dhanarjay…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Aug 2023 |
| Application filed | 20 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Navin Nishchal |
| Land area | 55.1 acres (22.3 ha) |
| Project cost | ₹3.4 crore |
| Village / locality | Amawan |
| Taluk / tehsil | Rajauli |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00506 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 May 2024 | Environmental approval granted | 55.1 acres | ₹3.4 crore |
| Early planning filed 20 Aug 2023 (this page) | Cleared for impact study | 55.1 acres | ₹3.4 crore |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 55.1 acres, this one is larger than 78% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Amawan, Rajauli, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project of Area 22.3 Ha at Sand Block-27 (Babhni balu Ghat) on… — environmental approval granted, 0 m away
- Sand Mining Project on Dhanarjay River at Sand Block-28 (Bargaon Sand Ghat) of… — environmental approval granted, 3.2 km away
- Sand Mining Project on Dhanarjay River at Sand Block-28 (Bargaon Sand Ghat) of… — cleared for impact study, 3.2 km away
- Forest Clearance for Construction of (1+2) = 2 Lane Staggered Toll Plaza in… — under forest review, 3.4 km away
- Sand Block No.- 13 (Karanpur 01 Sand Ghat & Bhupatpur Sand Ghat) on Khuri River — environmental approval granted, 5 km away
- Sand Block No.- 13 (Karanpur 01 Sand Ghat & Bhupatpur Sand Ghat) on Khuri River — returned to applicant, 5 km away
- Sand Block No.- 13 (Karanpur 01 Sand Ghat & Bhupatpur Sand Ghat) on Khuri River — cleared for impact study, 5 km away
- Proposed Brick Earth Mining "M/s Sri Gauri Int Udyog" at Mauza- Biraj, P.O-… — environmental approval granted, 5.4 km away
More from Navin Nishchal in Nawada
- Sand Mining Project of Area 19.3 Ha at Sand Block-20 (Manihauli balu Ghat) on… — environmental approval granted
- Sand Mining Project of Area 19.3 Ha at Sand Block-20 (Manihauli balu Ghat) on… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.