Quick answers
What is this project?
Sand Mining Project on Dhanarjay River at Sand Block-28 (Bargaon Sand Ghat) of District – Nawada of State-Bihar is an approved mining project in Bargawan, Sirdala, Nawada, Bihar. The site covers 128.5 acres.
Who is building it?
The applicant is Raju Raj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2024), as of 27 Nov 2026.
Where is it?
In Bargawan, Sirdala, Nawada, Bihar.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 128.5 acres.
When was it filed?
The application was filed on 22 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2024 |
| Application filed | 22 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raju Raj |
| Land area | 128.5 acres (52 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Bargawan |
| Taluk / tehsil | Sirdala |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00724 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Jul 2024 (this page) | Environmental approval granted | 128.5 acres | ₹1.7 crore |
| Early planning filed 15 Oct 2023 | Cleared for impact study | 128.5 acres | ₹1.7 crore |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 128.5 acres, this one is larger than 92% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bargawan, Sirdala, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project on Dhanarjay River at Sand Block-28 (Bargaon Sand Ghat) of… — cleared for impact study, 0 m away
- Sand Mining Project of Area 22.3 Ha at Sand Block-27 (Babhni balu Ghat) on… — environmental approval granted, 3.2 km away
- Sand Mining Project of Area 22.3 Ha at Sand Block-27 (Babhni balu Ghat) on… — cleared for impact study, 3.2 km away
- Sand Mining Project on Dhanarjay River at Sand Block-29 (Daulatpur Ghat) of… — environmental approval granted, 4.3 km away
- Sand Mining Project on Dhanarjay River at Sand Block-29 (Daulatpur Ghat) of… — cleared for impact study, 4.3 km away
- Forest Clearance for Construction of (1+2) = 2 Lane Staggered Toll Plaza in… — under forest review, 5.3 km away
- Proposed Brick Earth Mining for M/S Maa Devi Int Udyog- Khanwan Soil Brick… — environmental approval granted, 5.7 km away
- Brick Earth Mining for M/S Hero Int Udyog-Taran Soil Brick Mining Project — environmental approval granted, 5.9 km away
More from Raju Raj in Nawada
- Sand Mining Project, Block- 06 (Milky/Chilaungiya) Sand Ghat of District-… — environmental approval granted
- Sand Mining Project, Block- 06 (Milky/Chilaungiya) Sand Ghat of District-… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.