What is Developing? Open the mapMap

Cleared for impact studyMining · Saran, Bihar

Sand Mining Project on Gandak River at Sand Block-10 (Kalighat Darihara Sarla Balughat-2)

Sand Mining Project on Gandak River at Sand Block-10 (Kalighat Darihara Sarla Balughat-2) is a proposed mining project in Darihara Chaturbhuj, Dariapur, Saran, Bihar. The site covers 18.5 acres. Its stated project cost is ₹2.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Feb 2025).

See it on the live map All projects in Saran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project on Gandak River at Sand Block-10 (Kalighat Darihara Sarla Balughat-2) is a proposed mining project in Darihara Chaturbhuj, Dariapur, Saran, Bihar. The site covers 18.5 acres.

Who is building it?

The applicant is Eklavya Hsg Dky Jv.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 25 Feb 2025), as of 27 Nov 2026.

Where is it?

In Darihara Chaturbhuj, Dariapur, Saran, Bihar.

How big is it?

It has a stated cost of ₹2.3 crore and a site of 18.5 acres.

When was it filed?

The application was filed on 11 Dec 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project on Gandak River at Sand Block-10 (Kalighat Darihara Sarla Balughat-2)

Project details

StatusCleared for impact study
Status since25 Feb 2025
Application filed11 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantEklavya Hsg Dky Jv
Land area18.5 acres (7.5 ha)
Project cost₹2.3 crore
Village / localityDarihara Chaturbhuj
Taluk / tehsilDariapur
DistrictSaran
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00539

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Apr 2025Environmental approval granted18.5 acres₹2.3 crore
Early planning filed 11 Dec 2024 (this page)Cleared for impact study18.5 acres₹2.3 crore

In context

42 applications in Saran since January 2022 are in the same category (Mining): 36 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 18.5 acres, this one is larger than 60% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 37.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.

Where it is

Darihara Chaturbhuj, Dariapur, Saran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.