What is Developing? Open the mapMap

Under environmental reviewMining · Saran, Bihar

Proposed Sand Mining Project Sand Block: 10-Kalighat Darihara Sarla Balu ghat-3 at Mauza- Darihara Chaturbhuj, Block- Dariyapur, District- Saran, Bihar

Proposed Sand Mining Project Sand Block: 10-Kalighat Darihara Sarla Balu ghat-3 at Mauza- Darihara Chaturbhuj, Block- Dariyapur, District- Saran, Bihar is a proposed mining project in Darihara Chaturbhuj, Dariapur, Saran, Bihar. The site covers 18.5 acres. Its stated project cost is ₹1.8 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 29 Sept 2026).

See it on the live map All projects in Saran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project Sand Block: 10-Kalighat Darihara Sarla Balu ghat-3 at Mauza- Darihara Chaturbhuj, Block- Dariyapur, District- Saran, Bihar is a proposed mining project in Darihara Chaturbhuj, Dariapur, Saran, Bihar. The site covers 18.5 acres.

Who is building it?

The applicant is Rajeshwar Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Darihara Chaturbhuj, Dariapur, Saran, Bihar.

How big is it?

It has a stated cost of ₹1.8 crore and a site of 18.5 acres.

When was it filed?

The application was filed on 21 Apr 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project Sand Block: 10-Kalighat Darihara Sarla Balu ghat-3 at…

Project details

StatusUnder environmental review
Status since29 Sept 2026
Application filed21 Apr 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRajeshwar Singh
Land area18.5 acres (7.5 ha)
Project cost₹1.8 crore
Village / localityDarihara Chaturbhuj
Taluk / tehsilDariapur
DistrictSaran
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02405

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Sept 2026Environmental approval granted18.5 acres₹1.8 crore
Early planning filed 21 Apr 2026 (this page)Under environmental review18.5 acres₹1.8 crore

In context

42 applications in Saran since January 2022 are in the same category (Mining): 36 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 18.5 acres, this one is larger than 60% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 37.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Darihara Chaturbhuj, Dariapur, Saran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.