Quick answers
What is this project?
Sand Mining Project of Area 33.00 Ha at Sand Block-41A Ghat on Son River of District-Bhojpur of State-Bihar is a proposed mining project in Imadpur, Tarari, Bhojpur, Bihar. The site covers 81.5 acres.
Who is building it?
The applicant is Mukesh Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 May 2024), as of 27 Nov 2026.
Where is it?
In Imadpur, Tarari, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹16.7 crore and a site of 81.5 acres.
When was it filed?
The application was filed on 30 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project of Area 33.00 Ha at Sand Block-41A Ghat on Son River of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 May 2024 |
| Application filed | 30 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mukesh Kumar |
| Land area | 81.5 acres (33 ha) |
| Project cost | ₹16.7 crore |
| Village / locality | Imadpur |
| Taluk / tehsil | Tarari |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00599 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jul 2024 | Environmental approval granted | 81.5 acres | ₹16.7 crore |
| Early planning filed 30 Apr 2024 (this page) | Cleared for impact study | 81.5 acres | ₹16.7 crore |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 81.5 acres, this one is larger than 55% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 163.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Imadpur, Tarari, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project of Area 33.00 Ha at Sand Block-41A Ghat on Son River of… — environmental approval granted, 0 m away
- Sand Mining Project on Son river at Sand Block no. -41B of District-Bhojpur,… — environmental approval granted, 450 m away
- Sand Mining Project on Son river at Sand Block no. -41B of District-Bhojpur,… — cleared for impact study, 450 m away
- Proposed Sand Mining Project Bhojpur Sone-41C on Sone River of District-… — environmental approval granted, 850 m away
- Proposed Sand Mining Project Bhojpur Sone-41C on Sone River of District-… — cleared for impact study, 850 m away
- Sand Mining Project on Sand Block no- 42A, is located at Thana no- 449, Khata… — environmental approval granted, 1.2 km away
- Sand Mining Project on Sand Block no- 42A, is located at Thana no- 449, Khata… — lapsed, 1.2 km away
- Proposed Sand Mining Project of Area 39.5 Ha at Bhojpur Ghat 40 on Sone River… — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.