Environmental approval grantedMining · Bhojpur, Bihar

Sand Mining Project of Area 33.00 Ha at Sand Block-41A Ghat on Son River of District-Bhojpur of State-Bihar

Sand Mining Project of Area 33.00 Ha at Sand Block-41A Ghat on Son River of District-Bhojpur of State-Bihar is an approved mining project in Imadpur, Tarari, Bhojpur, Bihar. The site covers 81.5 acres. Its stated project cost is ₹16.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Aug 2024).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project of Area 33.00 Ha at Sand Block-41A Ghat on Son River of District-Bhojpur of State-Bihar is an approved mining project in Imadpur, Tarari, Bhojpur, Bihar. The site covers 81.5 acres.

Who is building it?

The applicant is Mukesh Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 11 Aug 2024), as of 27 Nov 2026.

Where is it?

In Imadpur, Tarari, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹16.7 crore and a site of 81.5 acres.

When was it filed?

The application was filed on 24 Jul 2024.

Project details

StatusEnvironmental approval granted
Status since11 Aug 2024
Application filed24 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantMukesh Kumar
Land area81.5 acres (33 ha)
Project cost₹16.7 crore
Village / localityImadpur
Taluk / tehsilTarari
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00654

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jul 2024 (this page)Environmental approval granted81.5 acres₹16.7 crore
Early planning filed 30 Apr 2024Cleared for impact study81.5 acres₹16.7 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 81.5 acres, this one is larger than 55% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 163.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Imadpur, Tarari, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.