What is Developing? Open the mapMap

Cleared for impact studyMining · Aurangabad, Bihar

Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District- Aurangabad, State- Bihar

Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Kera, Daudnagar, Aurangabad, Bihar. The site covers 62.5 acres. Its stated project cost is ₹11.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Jun 2024).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Kera, Daudnagar, Aurangabad, Bihar. The site covers 62.5 acres.

Who is building it?

The applicant is Kajal Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Jun 2024), as of 27 Nov 2026.

Where is it?

In Kera, Daudnagar, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹11.9 crore and a site of 62.5 acres.

When was it filed?

The application was filed on 20 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District- Aurangabad,…

Project details

StatusCleared for impact study
Status since4 Jun 2024
Application filed20 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKajal Singh
Land area62.5 acres (25.3 ha)
Project cost₹11.9 crore
Village / localityKera
Taluk / tehsilDaudnagar
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00695

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jan 2025Environmental approval granted62.5 acres₹11.9 crore
Early planning filed 20 May 2024 (this page)Cleared for impact study62.5 acres₹11.9 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 62.5 acres, this one is smaller than 60% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Kera, Daudnagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.