Quick answers
What is this project?
Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District- Aurangabad, State- Bihar is an approved mining project in Kera, Daudnagar, Aurangabad, Bihar. The site covers 62.5 acres.
Who is building it?
The applicant is Kajal Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Mar 2025), as of 27 Nov 2026.
Where is it?
In Kera, Daudnagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹11.9 crore and a site of 62.5 acres.
When was it filed?
The application was filed on 20 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Mar 2025 |
| Application filed | 20 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kajal Singh |
| Land area | 62.5 acres (25.3 ha) |
| Project cost | ₹11.9 crore |
| Village / locality | Kera |
| Taluk / tehsil | Daudnagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00928 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2025 (this page) | Environmental approval granted | 62.5 acres | ₹11.9 crore |
| Early planning filed 20 May 2024 | Cleared for impact study | 62.5 acres | ₹11.9 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 62.5 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Kera, Daudnagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District-… — cleared for impact study, 0 m away
- Proposed Sand Mining Project Aurangabad Sone- 6-A on Sone River of District-… — environmental approval granted, 550 m away
- Proposed Sand Mining Project Aurangabad Sone- 6-A on Sone River of District-… — cleared for impact study, 550 m away
- Proposed Sand Mining Project of Area 39.97 Ha at Aurangabad Ghat 07 on Sone… — cleared for impact study, 1.2 km away
- Proposed Sand Mining Project of Area 39.97 Ha at Aurangabad Ghat 07 on Sone… — environmental approval granted, 1.2 km away
- Proposed Sand Mining Project of Area 64.95 Ha at Aurangabad Ghat 05 on Sone… — environmental approval granted, 1.4 km away
- Proposed Sand Mining Project of Area 64.95 Ha at Aurangabad Ghat 05 on Sone… — cleared for impact study, 1.4 km away
- Diversion of 0.03975 Ha of Forest Land for Construction of Approach Road for… — more information requested, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.