Quick answers
What is this project?
Four Lane Highway From Manohar Chhapra Village Near Sahebganj (Ch. 44+650) to Charrahiya Village Near Areraj (Ch. 82+514) Section of Nh139w Under Bharatmala Pariyojana in the State of Bihar by NHAI is a proposed road project in Huseni, Kesaria, Purba Champaran, Bihar. The site covers 303.4 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Oct 2024), as of 27 Nov 2026.
Where is it?
In Huseni, Kesaria, Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹1,313.6 crore and a site of 303.4 acres.
When was it filed?
The application was filed on 20 Aug 2024.
Project details
| Official title | Development of Four Lane Highway From Manohar Chhapra Village Near Sahebganj (Ch. 44+650) to Charrahiya Village Near Areraj (Ch. 82+514) Section of Nh139w Under Bharatmala Pariyojana in the State of Bihar |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Oct 2024 |
| Application filed | 20 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 303.4 acres (122.8 ha) |
| Project cost | ₹1,313.6 crore |
| Village / locality | Huseni |
| Taluk / tehsil | Kesaria |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00710 |
In context
7 applications in Purba Champaran since January 2022 are in the same category (Roads & highways): 3 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Huseni, Kesaria, Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction and Up gradation to Four Lane from Sahebgan Design.Ch. Km 44+650,… — lapsed, 1.4 km away
- Proposed Brick clay mining project at Mauja- Sarotar, Block- Keshariya,… — environmental approval granted, 2.2 km away
- Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur,… — environmental approval granted, 4.3 km away
- Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur,… — cleared for impact study, 4.3 km away
- Brick Earth Mining project of M/s Icon Bricks — under environmental review, 6.7 km away
- Grain Based Ethanol Distillery capacity 100 KLPD with 2.5 MW co-generation… — environmental approval granted, 9 km away
- Proposed "Brick Earth Excavation Project" for M/s Jagdamba Bricks at Thana… — under environmental review, 9.1 km away
- Brick Earth Mining Project of M/s Janta Bricks — environmental approval granted, 9.4 km away
More from National Highways Authority of India (NHAI) in Purba Champaran
- Four Lane Highway From Areraj to Bettiah Section of Nh-139w (From Km 0.000 to… — cleared for impact study
6 National Highways Authority of India (NHAI) projects in Purba Champaran
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.