What is this project?
Grain Based Ethanol Distillery capacity 100 KLPD with 2.5 MW co-generation power plant by M/s Tirhut Udhyog Pvt Ltd is an approved industrial project in Khizirpara, Kesaria, Purba Champaran, Bihar. The site covers 11.9 acres.
Who is building it?
The applicant is Tirhut Udhyog Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 May 2024), as of 27 Nov 2026.
Where is it?
In Khizirpara, Kesaria, Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹137.5 crore and a site of 11.9 acres.
When was it filed?
The application was filed on 23 Jan 2024.
Project details
| Official title | Establishment of Grain Based Ethanol Distillery capacity 100 KLPD with 2.5 MW co-generation power plant at Village – Nayagaon Kushahar, Khijirpura, Tehsil – Kesaria, District - East Champaran, Bihar, Pin -845424, India by M/s Tirhut Udhyog Pvt Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 May 2024 |
| Application filed | 23 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tirhut Udhyog Private Limited |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹137.5 crore |
| Village / locality | Khizirpara |
| Taluk / tehsil | Kesaria |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00785 |
Where it is
Khizirpara, Kesaria, Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining Project of M/s Janta Bricks — environmental approval granted, 5.8 km away
- Proposed Brick clay mining project at Mauja- Sarotar, Block- Keshariya,… — environmental approval granted, 8 km away
- Four Lane Highway From Manohar Chhapra Village Near Sahebganj (Ch. 44+650) to… — cleared for impact study, 9 km away
- Construction and Up gradation to Four Lane from Sahebgan Design.Ch. Km 44+650,… — lapsed, 10.3 km away
- Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur,… — environmental approval granted, 10.6 km away
- Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur,… — cleared for impact study, 10.6 km away
- Amendment in Environment Clearance (EC) of Viraat Ramayana Mandir at Mauza:… — environmental approval granted, 10.7 km away
- Proposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01… — environmental approval granted, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.