Proposed Sand Mining Project Aurangabad Sone- 10-A on Sone River of District- Aurangabad, State- Bihar is an approved mining project in Adhaura, Obra, Aurangabad, Bihar. The site covers 86.5 acres.
Who is building it?
The applicant is Ramesh Kumar Bharti.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Oct 2025), as of 27 Nov 2026.
Where is it?
In Adhaura, Obra, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹10.8 crore and a site of 86.5 acres.
When was it filed?
The application was filed on 24 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Oct 2025 |
| Application filed | 24 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramesh Kumar Bharti |
| Land area | 86.5 acres (35 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Adhaura |
| Taluk / tehsil | Obra |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00899 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jul 2025 (this page) | Environmental approval granted | 86.5 acres | ₹10.8 crore |
| Early planning filed 23 Jul 2024 | Cleared for impact study | 86.5 acres | ₹10.8 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 86.5 acres, this one is larger than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 148.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Adhaura, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Aurangabad Sone- 10-A on Sone River of District-… — cleared for impact study, 0 m away
- Sand Mining Project Sand Block No.-10B Sand Ghat on Son river of District -… — environmental approval granted, 350 m away
- Sand Mining Project Sand Block No.-10B Sand Ghat on Son river of District -… — cleared for impact study, 350 m away
- Sand Mining Project, Aurangabad Son 10-C Sand Ghat of District- Aurangabad,… — environmental approval granted, 650 m away
- Sand Mining Project, Aurangabad Son 10-C Sand Ghat of District- Aurangabad,… — cleared for impact study, 650 m away
- Sand Mining Project, Aurangabad Son 11-A Sand Ghat of District- Aurangabad,… — environmental approval granted, 950 m away
- Sand Mining Project, Aurangabad Son 11-A Sand Ghat of District- Aurangabad,… — cleared for impact study, 950 m away
- Sand Mining Project, Aurangabad Son 11-C Sand Ghat, (Area- 24.5 Ha) Khata No.… — cleared for impact study, 1.6 km away
More from Ramesh Kumar Bharti in Aurangabad
- Proposed Sand Mining Project Aurangabad Sone- 3C on Sone River of District-… — environmental approval granted
- Proposed Sand Mining Project Aurangabad Sone- 3C on Sone River of District-… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.