Cleared for impact studyMining · Aurangabad, Bihar

Sand Mining Project, Aurangabad Son 11-C Sand Ghat, (Area- 24.5 Ha) Khata No. – 73 Khasra No.- 1/345 Thana No.- 12 Mauja– Adhaura Tehsil- Obra District- Aurangabad, Bihar Settlee: Shri Umesh Gupta

Sand Mining Project, Aurangabad Son 11-C Sand Ghat, (Area- 24.5 Ha) Khata No. – 73 Khasra No.- 1/345 Thana No.- 12 Mauja– Adhaura Tehsil- Obra District- Aurangabad, Bihar Settlee: Shri Umesh Gupta is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 60.5 acres. Its stated project cost is ₹8.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 22 Jan 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project, Aurangabad Son 11-C Sand Ghat, (Area- 24.5 Ha) Khata No. – 73 Khasra No.- 1/345 Thana No.- 12 Mauja– Adhaura Tehsil- Obra District- Aurangabad, Bihar Settlee: Shri Umesh Gupta is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 60.5 acres.

Who is building it?

The applicant is Umesh Gupta.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 22 Jan 2026), as of 27 Nov 2026.

Where is it?

In Dihra, Obra, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹8.8 crore and a site of 60.5 acres.

When was it filed?

The application was filed on 16 Jan 2026.

Project details

StatusCleared for impact study
Status since22 Jan 2026
Application filed16 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUmesh Gupta
Land area60.5 acres (24.5 ha)
Project cost₹8.8 crore
Village / localityDihra
Taluk / tehsilObra
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02315

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 60.5 acres, this one is smaller than 67% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 147 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.