Quick answers
What is this project?
Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of Ethanol as per EBP) alongwith 12 MW Power Cogeneration Project at Amodei, Block Ramgarhwa, Dist. East Champaran (Bihar) by M/s Ripuraj Gourmet Private Limited is a proposed industrial project in Amoei, Ramgarhwa, Purba Champaran, Bihar. The site covers 33.2 acres.
Who is building it?
The applicant is Ripuraj Gourmet Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Oct 2025), as of 27 Nov 2026.
Where is it?
In Amoei, Ramgarhwa, Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹575.4 crore and a site of 33.2 acres.
When was it filed?
The application was filed on 18 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of Ethanol as per…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Oct 2025 |
| Application filed | 18 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ripuraj Gourmet Private Limited |
| Land area | 33.2 acres (13.5 ha) |
| Project cost | ₹575.4 crore |
| Village / locality | Amoei |
| Taluk / tehsil | Ramgarhwa |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00960 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jan 2026 | Environmental approval granted | 33.2 acres | ₹575.4 crore |
| Early planning filed 18 Aug 2025 (this page) | Cleared for impact study | 33.2 acres | ₹575.4 crore |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amoei, Ramgarhwa, Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of… — environmental approval granted, 0 m away
- Proposed Brick Earth Mining for M/S Paramba Bricks - Ramgarhwa Soil Brick… — initial checks, 3.1 km away
- Brick Earth Mining for M/S Parmanand Singh Int Udyog - Ahiraulia Soil Brick… — environmental approval granted, 8.2 km away
- Proposed Brick Earth Mining for M/S Safal Eit Udyog - Inarwa Soil Brick Mining… — under environmental review, 13.9 km away
- Ordinary Earth Mining project of M/s Adyaraj Developers Pvt. Ltd., at Mauza-… — environmental approval granted, 14.3 km away
- Brick Earth Mining for M/S SABIR ENTERPRISES - Murtiya Soil Brick Mining… — environmental approval granted, 14.6 km away
- Conversion of Exisiting 60 Klpd Molasses/Juice/Ethanol Plant in to Dual Mode &… — initial checks, 18.4 km away
- PROPOSED BRICK EARTH MINING PROJECT LOCATED AT MAUJA-KUDARKAT, BLOCK:… — environmental approval granted, 21.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.