Quick answers
What is this project?
Brick Earth Mining for M/S SABIR ENTERPRISES - Murtiya Soil Brick Mining Project at Mauza+Vill-Murtiya, P.O+P.S-Adapur, Distt-East Champaran (Bihar) is an approved mining project in Murtia, Adapur, Purba Champaran, Bihar. The site covers 4.1 acres.
Who is building it?
The applicant is Sabir Ali.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Oct 2026), as of 27 Nov 2026.
Where is it?
In Murtia, Adapur, Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4.1 acres.
When was it filed?
The application was filed on 17 Sept 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sabir Ali |
| Land area | 4.1 acres (1.7 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Murtia |
| Taluk / tehsil | Adapur |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01853 |
In context
45 applications in Purba Champaran since January 2022 are in the same category (Mining): 30 approved, 15 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 4.1 acres, this one is smaller than 56% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Murtia, Adapur, Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S Safal Eit Udyog - Inarwa Soil Brick Mining… — under environmental review, 3.6 km away
- PROPOSED BRICK EARTH MINING PROJECT LOCATED AT MAUJA-KUDARKAT, BLOCK:… — environmental approval granted, 12.2 km away
- Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of… — environmental approval granted, 14.6 km away
- Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of… — cleared for impact study, 14.6 km away
- Proposed Brick Earth Mining for M/S Paramba Bricks - Ramgarhwa Soil Brick… — initial checks, 16.2 km away
- Ordinary Earth Mining project of M/s Adyaraj Developers Pvt. Ltd., at Mauza-… — environmental approval granted, 20 km away
- Brick Earth Mining for M/S Parmanand Singh Int Udyog - Ahiraulia Soil Brick… — environmental approval granted, 22.2 km away
- Brick Earth Mining Project of M/s Vihar Brick — under environmental review, 23 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.