What is Developing? Open the mapMap

Cleared for impact studyMining · Arwal, Bihar

Proposed Sand Mining Project of Area 20.0 Ha at Arwal Sone-08 (Kamta Bathe-02) Sand Ghat on Sone River of District-Arwal State-Bihar.

Proposed Sand Mining Project of Area 20.0 Ha at Arwal Sone-08 (Kamta Bathe-02) Sand Ghat on Sone River of District-Arwal State-Bihar is a proposed mining project in Bath, Kaler, Arwal, Bihar. The site covers 49.4 acres. Its stated project cost is ₹6.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Mar 2025).

See it on the live map All projects in Arwal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 20.0 Ha at Arwal Sone-08 (Kamta Bathe-02) Sand Ghat…

Project details

StatusCleared for impact study
Status since28 Mar 2025
Application filed13 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantShashibhushan Sharma
Land area49.4 acres (20 ha)
Project cost₹6.2 crore
Village / localityBath
Taluk / tehsilKaler
DistrictArwal
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00964

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Jan 2026Environmental approval granted49.4 acres₹6.2 crore
Early planning filed 13 Mar 2025 (this page)Cleared for impact study49.4 acres₹6.2 crore

In context

92 applications in Arwal since January 2022 are in the same category (Mining): 78 approved, 14 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 49.4 acres, this one is smaller than 57% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 173 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Bath, Kaler, Arwal, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shashibhushan Sharma in Arwal

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.