Quick answers
What is this project?
Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at Sirmatpur & adjacent villages by Adani Power Limited is a proposed power project in Simatpur, Pirpainti, Bhagalpur, Bihar. The site covers 1,183.6 acres.
Who is building it?
The applicant is Adani Power Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Oct 2025), as of 27 Nov 2026.
Where is it?
In Simatpur, Pirpainti, Bhagalpur, Bihar.
How big is it?
It has a stated cost of ₹28,225 crore and a site of 1,183.6 acres.
When was it filed?
The application was filed on 12 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at…
Project details
| Official title | Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at Sirmatpur & adjacent villages in Tehsil/block Pirpainti, District Bhagalpur, Bihar by Adani Power Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Oct 2025 |
| Application filed | 12 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Adani Power Limited |
| Land area | 1,183.6 acres (479 ha) |
| Project cost | ₹28,225 crore |
| Village / locality | Simatpur |
| Taluk / tehsil | Pirpainti |
| District | Bhagalpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01106 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Mar 2026 | Environmental approval granted | 1,183.6 acres | ₹28,225 crore |
| Early planning filed 12 Sept 2025 (this page) | Cleared for impact study | 1,183.6 acres | ₹28,225 crore |
In context
6 applications in Bhagalpur since January 2022 are in the same category (Power): 2 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Simatpur, Pirpainti, Bhagalpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project… — environmental approval granted, 0 m away
- Expansion of Pirpainti Thermal Power Plant from 2400(3x800) MW (Phase I) to… — under environmental review, 100 m away
- Expansion of Pirpainti Thermal Power Plant from 2400(3x800) MW (Phase I) to… — withdrawn, 100 m away
- M/S G S B Udyog Proposed Brick Clay Mining Project at Mauza- Harin Kol, Block-… — environmental approval granted, 1.8 km away
- Proposed Brick Earth Mining for M/S A M R BRICKS - Imamnagar Soil Brick Mining… — environmental approval granted, 2.3 km away
- M/s Ram Swaroop Ceramics Marks - RSC Proposed Brick clay Mining Project at… — environmental approval granted, 2.4 km away
- Brick Earth Mining project of M/s P.A.G. Bricks at Mauza- Imamnagar, Block-… — environmental approval granted, 2.7 km away
- M/S W. B. B. Bricks Proposed Brick Clay Mining Project at Mauza- Manikpur,… — environmental approval granted, 4 km away
More from Adani Power Limited in Bhagalpur
- Expansion of Pirpainti Thermal Power Plant from 2400(3x800) MW (Phase I) to… — under environmental review
- Expansion of Pirpainti Thermal Power Plant from 2400(3x800) MW (Phase I) to… — withdrawn
4 Adani Power projects in Bhagalpur
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.