What is Developing? Open the mapMap

Cleared for impact studyPower · Bhagalpur, Bihar

Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at Sirmatpur & adjacent villages by Adani Power Limited

Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at Sirmatpur & adjacent villages by Adani Power Limited is a proposed power project in Simatpur, Pirpainti, Bhagalpur, Bihar. The site covers 1,183.6 acres. Its stated project cost is ₹28,225 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 27 Oct 2025).

See it on the live map All projects in Bhagalpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at Sirmatpur & adjacent villages by Adani Power Limited is a proposed power project in Simatpur, Pirpainti, Bhagalpur, Bihar. The site covers 1,183.6 acres.

Who is building it?

The applicant is Adani Power Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 27 Oct 2025), as of 27 Nov 2026.

Where is it?

In Simatpur, Pirpainti, Bhagalpur, Bihar.

How big is it?

It has a stated cost of ₹28,225 crore and a site of 1,183.6 acres.

When was it filed?

The application was filed on 12 Sept 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at…

Project details

Official titleProposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project at Sirmatpur & adjacent villages in Tehsil/block Pirpainti, District Bhagalpur, Bihar by Adani Power Limited
StatusCleared for impact study
Status since27 Oct 2025
Application filed12 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantAdani Power Limited
Land area1,183.6 acres (479 ha)
Project cost₹28,225 crore
Village / localitySimatpur
Taluk / tehsilPirpainti
DistrictBhagalpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01106

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Mar 2026Environmental approval granted1,183.6 acres₹28,225 crore
Early planning filed 12 Sept 2025 (this page)Cleared for impact study1,183.6 acres₹28,225 crore

In context

6 applications in Bhagalpur since January 2022 are in the same category (Power): 2 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Simatpur, Pirpainti, Bhagalpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Adani Power Limited in Bhagalpur

4 Adani Power projects in Bhagalpur
All 68 Adani Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.