Quick answers
What is this project?
Brick Earth Mining project of M/s. SNB Bricks at Mauza- Mahwas Dhaniari, Block- Belhar, District- Banka, Bihar is an approved mining project in Tola Tintaharia, Belhar, Banka, Bihar. The site covers 2.2 acres.
Who is building it?
The applicant is Sunil Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Feb 2026), as of 27 Nov 2026.
Where is it?
In Tola Tintaharia, Belhar, Banka, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 2.2 acres.
When was it filed?
The application was filed on 8 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Feb 2026 |
| Application filed | 8 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Kumar |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Tola Tintaharia |
| Taluk / tehsil | Belhar |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01156 |
In context
32 applications in Banka since January 2022 are in the same category (Mining): 24 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.2 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Tola Tintaharia, Belhar, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s B.S.M. Proposed Brick Clay Mining Project is situated at Mauza- Mahwas… — environmental approval granted, 1.9 km away
- Sand Mining Project, Badua Unit No 2 Sand Ghat of District- Banka, State-Bihar — environmental approval granted, 11 km away
- Sand Mining Project, Badua Unit No 2 Sand Ghat of District- Banka, State-Bihar — cleared for impact study, 11 km away
- Brick Earth Mining for M/S G G H Bricks- Kumrel Soil Brick Mining Project… — environmental approval granted, 11.6 km away
- Sand Mining Project of Prithvichak balu ghat of Area 10.0 Ha on Badua River of… — environmental approval granted, 13.3 km away
- Sand Mining Project of Prithvichak balu ghat of Area 10.0 Ha on Badua River of… — cleared for impact study, 13.3 km away
- Jhajha to Tola Tamoliya OFC Laying 41.1 Km. by JDFPL — more information requested, 13.5 km away
- Grid Connectivity to villages of Chanan and Belhar Block of Banka District — more information requested, 14 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.