Quick answers
What is this project?
Proposed Brick Earth Mining Project of M/s J.B.J. INT UDYOG at Mauza - Ratanpur, Block - Gidhour, District - Jamui, Bihar (Area - 1.22 ha.) is an approved mining project in Ratanpur, Gidhaur, Jamui, Bihar. The site covers 3 acres.
Who is building it?
The applicant is Rawal Yashwant Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Apr 2025), as of 27 Nov 2026.
Where is it?
In Ratanpur, Gidhaur, Jamui, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 3 acres.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Apr 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rawal Yashwant Singh |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Ratanpur |
| Taluk / tehsil | Gidhaur |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01238 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.
Where it is
Ratanpur, Gidhaur, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project of Area 9.76 Ha at Sand Block-06 Ghat on Ulai River of… — environmental approval granted, 950 m away
- Sand Mining Project of Area 9.76 Ha at Sand Block-06 Ghat on Ulai River of… — cleared for impact study, 950 m away
- Sand Ghat Mining Project (Ulai River Block No. -07 Sand Ghat) at Ulai River bed — environmental approval granted, 2.2 km away
- Sand Ghat Mining Project (Ulai River Block No. -07 Sand Ghat) at Ulai River bed — cleared for impact study, 2.2 km away
- Proposed Brick Earth Mining Project of M/S M.R.P. INT UDYOG at Mauza - Sonpai,… — environmental approval granted, 2.6 km away
- Proposed Brick Earth Mining Project of M/S R.P.M. BRICKS at Mauza - Sonpe,… — environmental approval granted, 2.6 km away
- Sand Ghat Mining Project (Anjana river Block – 02) — environmental approval granted, 2.9 km away
- Sand Ghat Mining Project (Anjana river Block – 02) — cleared for impact study, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.