Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Feb 2026 |
| Application filed | 25 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Amit Kumar Shah |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Chanan |
| Taluk / tehsil | Basopatti |
| District | Madhubani |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01336 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Dec 2025 (this page) | Environmental approval granted | 4.7 acres | ₹6 lakh |
| New project filed 1 Dec 2025 | Withdrawn | 4.7 acres | ₹6 lakh |
In context
152 applications in Madhubani since January 2022 are in the same category (Mining): 125 approved, 19 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.7 acres, this one is larger than 54% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 14.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Chanan, Basopatti, Madhubani, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Jay Maa Int Udyog- Chanan Soil Brick Mining Project… — withdrawn, 150 m away
- Proposed Brick Earth Mining for M/S Jay Maa Int Udyog- Chanan Soil Brick… — withdrawn, 150 m away
- Proposed Brick Earth Mining for M/S Baidyanath Int Udyog - Kahirhar Soil Brick… — under environmental review, 1 km away
- Brick Earth Mining for M/S Shree Int Udyog - Damu Soil Brick Mining Project — environmental approval granted, 3 km away
- Proposed Brick Earth Mining for M/S BHAGWATI INT UDYOG - Sisauni Soil Brick… — environmental approval granted, 5.1 km away
- Proposed Brick Earth Mining for M/S GANGA INT UDYOG - Kauaaha Barhi Soil Brick… — environmental approval granted, 6.3 km away
- Brick Earth Mining for M/S Jay Mata Int Udyog- Baurahar Soil Brick Mining… — environmental approval granted, 6.3 km away
- Brick Earth Mining for M/S Shubh Int Udyog- Hisar Borhar Soil Brick Mining… — environmental approval granted, 6.6 km away
More from Amit Kumar Shah in Madhubani
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.