Project details
| Official title | Brick Earth Mining for M/S Shree Int Udyog - Damu Soil Brick Mining Project at Village+P.O-Damu, P.S-Basopatti, Distt-Madhubani (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Jun 2026 |
| Application filed | 5 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Thakur |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Damu |
| Taluk / tehsil | Basopatti |
| District | Madhubani |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01827 |
In context
152 applications in Madhubani since January 2022 are in the same category (Mining): 125 approved, 19 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.7 acres, this one is larger than 60% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Damu, Basopatti, Madhubani, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Jay Maa Int Udyog- Chanan Soil Brick Mining Project… — withdrawn, 2.9 km away
- Proposed Brick Earth Mining for M/S Jay Maa Int Udyog- Chanan Soil Brick… — withdrawn, 2.9 km away
- Brick Earth Mining for M/S Jay Maa Int Udyog- Chanan Soil Brick Mining Project… — environmental approval granted, 3 km away
- Proposed Brick Earth Mining for M/S BHAGWATI INT UDYOG - Sisauni Soil Brick… — environmental approval granted, 3.1 km away
- Proposed Brick Earth Mining for M/S Baidyanath Int Udyog - Kahirhar Soil Brick… — under environmental review, 3.8 km away
- Proposed Brick clay mining project of M/s Hari Om Int Udyog at Mauza-… — environmental approval granted, 4.6 km away
- Proposed Brick clay mining project of M/s Hari Om Int Udyog at Mauza-… — environmental approval granted, 4.9 km away
- Erm of Kamla Irrigation Project, Bihar — under environmental review, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.